Parameter Detail: ICE-09(run 9)
| start date (GMT) | 2009-02-15 (46) |
|---|---|
| end date (GMT) | 2009-02-16 (47) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -1.5 |
| nucleation cell temperature (post nucleation) [degC] | 0 -> -10 |
| control time (stabilization start) | 23:36:54 |
| control time (nucleation start) | 01:04:07 |
| control time (laten heat release) | 01:04:50 |
| control time (crystalize start) | 01:30:00 |
| control time (melt start) | 01:30:00 |
| control time (melt end) | 01:30:00 |
| control duration (stabilization) | 01:27:13 |
| control duration (nucleation) | 00:00:43 |
| control duration (crystalization) | 00:25:53 |
| control duration (observation) | 00:00:00 |
| control duration (total) | 00:25:53 |
| note |