Parameter Detail: ICE-09(run 10)
| start date (GMT) | 2009-02-17 (48) |
|---|---|
| end date (GMT) | 2009-02-17 (48) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.1 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 02:25:27 |
| control time (nucleation start) | 03:43:49 |
| control time (laten heat release) | 03:45:10 |
| control time (crystalize start) | 03:55:20 |
| control time (melt start) | 05:45:00 |
| control time (melt end) | 05:47:00 |
| control duration (stabilization) | 01:18:22 |
| control duration (nucleation) | 00:01:21 |
| control duration (crystalization) | 00:11:31 |
| control duration (observation) | 01:49:40 |
| control duration (total) | 02:03:11 |
| note |