Parameter Detail: ICE-10(run 3)
| start date (GMT) | 2009-01-18 (18) |
|---|---|
| end date (GMT) | 2009-01-19 (19) |
| degree of supercooling | 0.40 |
| crystalization cell temperature [degC] | 3.42 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -10 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 22:44:02 |
| control time (nucleation start) | 00:17:31 |
| control time (laten heat release) | 00:19:48 |
| control time (crystalize start) | 00:21:45 |
| control time (melt start) | 00:24:38 |
| control time (melt end) | 00:27:25 |
| control duration (stabilization) | 01:33:29 |
| control duration (nucleation) | 00:02:17 |
| control duration (crystalization) | 00:04:14 |
| control duration (observation) | 00:02:53 |
| control duration (total) | 00:09:54 |
| note |