Parameter Detail: ICE-10(run 5)
| start date (GMT) | 2009-01-31 (31) |
|---|---|
| end date (GMT) | 2009-01-31 (31) |
| degree of supercooling | 0.40 |
| crystalization cell temperature [degC] | 3.42 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -4.5 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 01:01:46 |
| control time (nucleation start) | 03:15:50 |
| control time (laten heat release) | 03:16:56 |
| control time (crystalize start) | 03:45:00 |
| control time (melt start) | 03:50:00 |
| control time (melt end) | 03:55:00 |
| control duration (stabilization) | 02:14:04 |
| control duration (nucleation) | 00:01:06 |
| control duration (crystalization) | 00:29:10 |
| control duration (observation) | 00:05:00 |
| control duration (total) | 00:39:10 |
| note |