Parameter Detail: ICE-01(run 8)
| start date (GMT) | 2008-12-25 (360) |
|---|---|
| end date (GMT) | 2008-12-25 (360) |
| degree of supercooling | 0.03 |
| crystalization cell temperature [degC] | 3.79 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6.8 |
| nucleation cell temperature (post nucleation) [degC] | 3.79 -> 3.67 |
| control time (stabilization start) | 03:55:00 |
| control time (nucleation start) | 05:10:55 |
| control time (laten heat release) | 05:12:00 |
| control time (crystalize start) | 05:36:00 |
| control time (melt start) | 05:53:29 |
| control time (melt end) | 05:56:17 |
| control duration (stabilization) | 01:15:55 |
| control duration (nucleation) | 00:01:05 |
| control duration (crystalization) | 00:25:05 |
| control duration (observation) | 00:17:29 |
| control duration (total) | 00:45:22 |