Parameter Detail: ICE-10(run 7)
| start date (GMT) | 2009-02-15 (46) |
|---|---|
| end date (GMT) | 2009-02-15 (46) |
| degree of supercooling | 0.40 |
| crystalization cell temperature [degC] | 3.42 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | 18 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 20:18:26 |
| control time (nucleation start) | 22:17:24 |
| control time (laten heat release) | 22:18:05 |
| control time (crystalize start) | |
| control time (melt start) | 22:38:00 |
| control time (melt end) | 22:38:00 |
| control duration (stabilization) | 01:58:58 |
| control duration (nucleation) | 00:00:41 |
| control duration (crystalization) | |
| control duration (observation) | |
| control duration (total) | 00:20:36 |
| note |