Parameter Detail: ICE-11(run 1)
| start date (GMT) | 2008-12-01 (336) |
|---|---|
| end date (GMT) | 2008-12-01 (336) |
| degree of supercooling | 0.50 |
| crystalization cell temperature [degC] | 3.32 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -5.4 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 21:53:00 |
| control time (nucleation start) | 22:47:00 |
| control time (laten heat release) | 22:48:00 |
| control time (crystalize start) | 22:57:00 |
| control time (melt start) | 23:00:00 |
| control time (melt end) | 23:03:00 |
| control duration (stabilization) | 00:54:00 |
| control duration (nucleation) | 00:01:00 |
| control duration (crystalization) | 00:10:00 |
| control duration (observation) | 00:03:00 |
| control duration (total) | 00:16:00 |
| note |