Parameter Detail: ICE-11(run 3)
| start date (GMT) | 2009-01-05 (5) |
|---|---|
| end date (GMT) | 2009-01-05 (5) |
| degree of supercooling | 0.50 |
| crystalization cell temperature [degC] | 3.32 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -12.5 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 20:18:00 |
| control time (nucleation start) | 21:18:55 |
| control time (laten heat release) | 21:30:50 |
| control time (crystalize start) | 21:31:05 |
| control time (melt start) | 21:34:30 |
| control time (melt end) | 21:38:04 |
| control duration (stabilization) | 01:00:55 |
| control duration (nucleation) | 00:11:55 |
| control duration (crystalization) | 00:12:10 |
| control duration (observation) | 00:03:25 |
| control duration (total) | 00:19:09 |
| note |