Parameter Detail: ICE-11(run 4)
| start date (GMT) | 2009-01-22 (22) |
|---|---|
| end date (GMT) | 2009-01-22 (22) |
| degree of supercooling | 0.50 |
| crystalization cell temperature [degC] | 3.32 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -3.9 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 19:49:15 |
| control time (nucleation start) | 21:15:32 |
| control time (laten heat release) | 21:16:25 |
| control time (crystalize start) | 21:27:10 |
| control time (melt start) | 21:30:52 |
| control time (melt end) | 21:33:57 |
| control duration (stabilization) | 01:26:17 |
| control duration (nucleation) | 00:00:53 |
| control duration (crystalization) | 00:11:38 |
| control duration (observation) | 00:03:42 |
| control duration (total) | 00:18:25 |
| note |