Parameter Detail: ICE-11(run 6)
| start date (GMT) | 2009-01-28 (28) |
|---|---|
| end date (GMT) | 2009-01-29 (29) |
| degree of supercooling | 0.50 |
| crystalization cell temperature [degC] | 3.32 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -3.3 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 23:40:47 |
| control time (nucleation start) | 00:43:55 |
| control time (laten heat release) | 00:44:45 |
| control time (crystalize start) | 01:07:30 |
| control time (melt start) | 01:10:01 |
| control time (melt end) | 01:13:40 |
| control duration (stabilization) | 01:03:08 |
| control duration (nucleation) | 00:00:50 |
| control duration (crystalization) | 00:23:35 |
| control duration (observation) | 00:02:31 |
| control duration (total) | 00:29:45 |