Parameter Detail: ICE-01(run 9)
| start date (GMT) | 2008-12-25 (360) |
|---|---|
| end date (GMT) | 2008-12-25 (360) |
| degree of supercooling | 0.03 |
| crystalization cell temperature [degC] | 3.79 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -10 |
| nucleation cell temperature (post nucleation) [degC] | 3.79 -> 3.73 |
| control time (stabilization start) | 20:06:05 |
| control time (nucleation start) | 21:13:33 |
| control time (laten heat release) | 21:16:50 |
| control time (crystalize start) | 21:36:30 |
| control time (melt start) | 22:04:03 |
| control time (melt end) | 22:06:50 |
| control duration (stabilization) | 01:07:28 |
| control duration (nucleation) | 00:03:17 |
| control duration (crystalization) | 00:22:57 |
| control duration (observation) | 00:27:33 |
| control duration (total) | 00:53:17 |
| note |