Parameter Detail: ICE-13(run 2)
| start date (GMT) | 2009-01-22 (22) |
|---|---|
| end date (GMT) | 2009-01-22 (22) |
| degree of supercooling | 0.70 |
| crystalization cell temperature [degC] | 3.12 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -5.6 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 21:48:28 |
| control time (nucleation start) | 22:52:47 |
| control time (laten heat release) | 22:53:50 |
| control time (crystalize start) | 23:03:00 |
| control time (melt start) | 23:04:50 |
| control time (melt end) | 23:07:55 |
| control duration (stabilization) | 01:04:19 |
| control duration (nucleation) | 00:01:03 |
| control duration (crystalization) | 00:10:13 |
| control duration (observation) | 00:01:50 |
| control duration (total) | 00:15:08 |
| note |