Parameter Detail: ICE-13(run 4)
| start date (GMT) | 2009-01-27 (27) |
|---|---|
| end date (GMT) | 2009-01-27 (27) |
| degree of supercooling | 0.70 |
| crystalization cell temperature [degC] | 3.12 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -3 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 01:21:18 |
| control time (nucleation start) | 03:00:32 |
| control time (laten heat release) | 03:01:13 |
| control time (crystalize start) | 03:18:10 |
| control time (melt start) | 03:20:00 |
| control time (melt end) | 03:23:12 |
| control duration (stabilization) | 01:39:14 |
| control duration (nucleation) | 00:00:41 |
| control duration (crystalization) | 00:17:38 |
| control duration (observation) | 00:01:50 |
| control duration (total) | 00:22:40 |
| note |