Parameter Detail: ICE-13(run 5)
| start date (GMT) | 2009-01-28 (28) |
|---|---|
| end date (GMT) | 2009-01-28 (28) |
| degree of supercooling | 0.70 |
| crystalization cell temperature [degC] | 3.12 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -3.6 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 21:54:50 |
| control time (nucleation start) | 23:19:38 |
| control time (laten heat release) | 23:20:28 |
| control time (crystalize start) | 23:29:20 |
| control time (melt start) | 23:31:07 |
| control time (melt end) | 23:34:13 |
| control duration (stabilization) | 01:24:48 |
| control duration (nucleation) | 00:00:50 |
| control duration (crystalization) | 00:09:42 |
| control duration (observation) | 00:01:47 |
| control duration (total) | 00:14:35 |
| note |