Parameter Detail: DS1-11
| start date (GMT) | 2013-10-24 (297) |
|---|---|
| end date (GMT) | 2013-10-25 (298) |
| team | |
| disk diameter [mm] | 30 |
| target liquid bridge length [mm] | 30 |
| initial gap [mm] | 3.00 |
| cooling disk position at the end of experiment [mm] | 0 |
| aspect ratio (L/D) | 1 |
| typical volume ratio (V/V0) | 1 |
| MIDM image position from HD surface (Edge) [mm] | 2.0 |
| recording status | with VRU Rec. |
| operation target | measuremnet of DSD, flow transition, oscillation mode |
| note | No movie from GMT04:25 to 05:34 and the telemetry data after 4:25 is lacked intermittently. |