Parameter Detail: DS2-01
| start date (GMT) | 2014-11-30 (334) |
|---|---|
| end date (GMT) | 2014-12-01 (335) |
| team | |
| disk diameter [mm] | 10 |
| target liquid bridge length [mm] | |
| initial gap [mm] | |
| cooling disk position at the end of experiment [mm] | 3 |
| aspect ratio (L/D) | |
| typical volume ratio (V/V0) | |
| MIDM image position from HD surface (Edge) [mm] | |
| recording status | without VRU Rec. |
| operation target | functional check |
| note | checkout operation (cont.); misaligned IR image fieldcheckout operation; |