| start date (GMT) |
2015-01-21 (21) |
| end date (GMT) |
2015-01-22 (22) |
| team |
|
| disk diameter [mm] |
10 |
| target liquid bridge length [mm] |
5, 2.5 |
| initial gap [mm] |
5.00 |
| cooling disk position at the end of experiment [mm] |
0, 2.5 |
| aspect ratio (L/D) |
0.5, 0.25 |
| typical volume ratio (V/V0) |
1 |
| MIDM image position from HD surface (Edge) [mm] |
0.23 -> 0.12 |
| recording status |
with VRU Rec. No Down link video. |
| operation target |
critical DT -> influence of cooling disk temp. on critical DT |
| note |
I/O Box OFF at 03:40. After 3:40, Experiment has been canceled. |